The Iron Triangle – Episode 9
In this episode, the Outsiders delve into the Iron Triangle and discuss dealing with the critical project constraints of cost/resources, time and scope. Is there a silver bullet to address these age-old constraints? Is there a lever a Product Owner can pull to tackle them wisely? Listen in to find out.